Skip to main content
SisuLift
SisuLiftSisuLiftCoach portal
Skip to main content
CalculatorsFree, no sign-up

1RM Calculator

Estimate your one rep max from any set. The calculator shows the Epley, Brzycki and Lander formulas side by side, the average and a percentage table for training weights.

Most accurate from 1-10 rep sets. The calculator accepts more than 12 reps, but the estimate weakens.

Fill in the fields to see your result instantly.

Results are estimates intended for healthy adults. They do not replace advice from a doctor or dietitian.

The calculator is free and your result is not stored.

From calculator to practice

Max known. The next question is what to do with it.

SisuLift estimates 1RM from every logged set and shows progress by exercise without you ever testing a max.

  • e1RM progress by exercise in the monthly report
  • Weekly progression suggests next weights from your actual sets
  • About 4,000 exercises with animations
Try SisuLift for free→

The free tier needs no card.

SisuLift progress view: estimated 1RM by exercise

If you also want to know how much to eat, the calorie calculator works out your calorie needs and macros for your goal.

How 1RM is calculated

Your one rep max, 1RM, is the heaviest weight you can lift once with clean technique. It can be estimated from a submaximal set with a formula. The Epley formula (1985) is weight × (1 + reps / 30), the Brzycki formula (1993) weight × 36 / (37 − reps) and the Lander formula (1985) 100 × weight / (101.3 − 2.67123 × reps).

The formulas agree closely for 1-5 reps and start to diverge on longer sets: Epley estimates slightly higher, Brzycki lower. That is why the calculator shows all three and the average. The SisuLift app uses the Epley formula in its reports.

How to use 1RM in training

The most common use is percentage-based programming: strength sets of 3-5 reps at about 85-90 percent, hypertrophy sets of 8-12 reps at about 70-80 percent. The percentage table gives weights directly; the working weight calculator also accounts for an RIR target.

Estimated 1RM moves day to day with sleep, recovery and technique. Treat it as a guide, not a law: if an 85 percent set feels like 95, listen to your body. You never need to test a true max; logged working sets are enough for tracking.

Frequently asked questions

What is 1RM?

1RM (one repetition maximum) is the heaviest weight you can lift once with proper technique. It is used as a measure of strength and as the basis for calculating training weights.

Which 1RM formula is the most accurate?

From sets under five reps all three formulas land within a few percent. On longer sets Brzycki is usually the most conservative and Epley the most optimistic. The average is a good compromise, and in the end your actual lift decides.

How accurate is a 1RM calculator?

In research the formulas typically land within 5 percent of a true max when the set is 1-6 reps and taken close to failure. From sets above 10 reps the error grows, because endurance starts to matter alongside strength.

Is testing your 1RM safe?

For an experienced lifter with a good warm-up and a spotter, yes, but it is not necessary. An estimated 1RM from a 3-5 rep set is enough for almost all programming, and it is the safer route, especially for beginners.

How many reps can you do at each percentage?

Roughly: 90 % about 3-4 reps, 85 % about 5-6, 80 % about 8, 75 % about 10 and 70 % about 12. Individual differences are large: an endurance-type lifter gets more reps at the same percentage than a strength-type lifter.

Does SisuLift calculate 1RM automatically?

Yes. The app estimates 1RM with the Epley formula from every logged working set and shows progress by exercise in the monthly report. You never need to test a max separately.

See also

  1. 01Working Weight Calculator1RM or your last set turned into set weights by reps and RIR target.
  2. 02Bench Press CalculatorBench 1RM and strength level relative to body weight.
  3. 03Protein CalculatorHow much protein do you need per day? Recommendation and range.

From calculator to practice

The calculator gives you a number. SisuLift keeps it up to date.

Program, weights, nutrition and recovery in one app. The free tier needs no card, and the 14-day trial needs no card either.